Nov 27, 2011 - House Build    2 Comments

Days 47 – 51

It was an eventful week on the house build last week.  A lot happened and changed in a short space of time.  All of the internal walls on the ground floor were marked out and the framing for the outside was started. Over the course of a couple of days the outside walls were put up – which really gave us a feel for the how the inside was going to be.  We went into where living room is going to be and were confronted with this huge framed hole in the wall.  This was going to be our window.  We knew it was a big window but didn’t comprehend just how big until we saw the gap for it.

After the outside framing was up, the weather decided to change and it snowed (see Proper Snow post).  This didn’t stop the work though.  They started to put up the sheeting for the side of the house on the day it was snowing.  The next day, after spending 2 hours shoveling the snow out of the house, they built the staircase down to the basement (no more climbing in through windows 🙂 ).  Finally on the Friday, the garage started to emerge.

So, there was a lot of progress last week.  We have been told that the plan for next week is to get the same amount done – and a bit more 🙂

Oct 11, 2011 - House Build    No Comments

Day 6

This weekend was Thanksgiving weekend and so we hadn’t been up to the site for a couple of days, thinking that everyone would have been on holiday…… we were wrong.  When we went up this morning we were amazed to see that we had walls in our basement.  Not only did we have walls but we also had frames for windows.  It was looking like a house.

The guys had worked part of the weekend and had made brilliant progress.  When we arrived they were just finishing off the framework for the garage foundations and we were told that the cement trucks were coming in the afternoon.  So we took a few pictures and went back to the village to refuel (lunch) before going back to site for 14.00.

Well it was about 14.30 when we got there.  We found 2 trucks on site, one cement truck and one rig for pumping the cement.  All was quiet though apart from the slow turning of the cement in the truck.  The rig was broken 🙁 It took 6 guys an hour to fix the broken rig and get it functioning again.  At one point there was a man inside the rig trying to unblock it.  The space was so tiny we wondered if he would get back out of it again.  Every so often we would see a hand come out of this little window to get a hammer or some other implement to hit the rig with.

At 15.30 it started to pump and we watched as they filled the garage foundation, the pillar supports for our steps and then the basement walls.  After an hour they were about 2 feet up the inside of the walls – with another 7 feet to go we decided it was probably best to head home.  We also needed to make the most of a clear space behind the car.  With the hour long hold up there were now 3 cement trucks and the rig on site, as well as the contractors vehicles and the fourth truck was due.  Time to make a quick exit.